players online
Support us
Vz. 58 Medvěd
Cost11,050(~€39.22)
IXCzechoslovakiaHeavy tankBreakthroughPremium

Vz. 58 Medvěd

World of Tanks EU statistics for the IX CZECH heavy tank Vz. 58 Medvěd.

Vz. 58 Medvěd characteristics

Firepower

Damage
440hp
… vs modules
180hp
Penetration
257mm
… at 500m
237mm
DPM
2,101
Reload
39.00s
… intra-clip
3.75s
Clip size
4
… clip damage
1,760hp
Rate of fire
4.78/min
Aim time
3.00s
Dispersion
0.450m
… moving
0.240
… hull traverse
0.240
… turret traverse
0.150
… after firing
4.00×
… gun damaged
2.00×
Shell velocity
1,040m/s
Max range
720m
Caliber
122mm
Ammo capacity
40
… potential damage
17,600hp
Shell cost
1,020
… full ammo
40,800
Gun depression
20°
Gun elevation
8°
Gun traverse range
360°

Mobility

Top speed
36km/h
Reverse speed
16km/h
Engine power
1,000hp
Power/weight
17.5hp/t
Hull traverse
26.0°/s
Turret traverse
26.0°/s
Terrain resistance
… hard
1.30
… medium
1.40
… soft
2.30
Effective speed
… hard
36.0km/h
… medium
36.0km/h
… soft
27.9km/h
Effective traverse
… hard
26.0°/s
… medium
24.1°/s
… soft
14.7°/s

Survivability

Hit points
1,750hp
Hull armor
… front
105mm
… side
70mm
… rear
40mm
Turret armor
… front
270mm
… side
80mm
… rear
50mm
Track armor
30mm
Fire chance
15.0%
Track repair time
12.03s
Module HP (max / repaired)
… ammo rack
240 / 160hp
… track
250 / 190hp
… engine
370 / 185hp
… fuel tank
200 / 80hp
… turret ring
150 / 75hp
… viewport
110 / 55hp

Spotting & other

View range
390m
Signal range
730m
Camouflage
… stationary
7.4%
… moving
3.7%
Weight
57.0t

Ammunition

Equipment

Consumables

Directives

Field Modifications

Crew Skills

Crew level100%
Commander / Radio Operator
Gunner
Driver
Loader

Vz. 58 Medvěd modules

X122 mm vz. 122 L/52Stock
IXVz. 58 MedvědStock
IXDTN-10Stock
IXVz. 58 MedvědStock
XRadiostanice R-112Stock
IXMedvěd

Vz. 58 Medvěd historical reference

A heavy tank project that utilized many modern technical solutions. The project required rather lengthy refinement and significant funding. In the meantime, a license for producing the T-54 tanks was issued, so the heavy tank project was discontinued.