players online
Support us
Vercingétorix
Cost9,900(~€35.45)
IXFranceMedium tankAssaultPremium

Vercingétorix

World of Tanks EU statistics for the IX FRANCE medium tank Vercingétorix.

Vercingétorix characteristics

Firepower

Damage
400hp
… vs modules
165hp
Penetration
253mm
… at 500m
230mm
DPM
2,449
Reload
9.80s
Rate of fire
6.12/min
Aim time
2.30s
Dispersion
0.360m
… moving
0.180
… hull traverse
0.180
… turret traverse
0.100
… after firing
4.00×
… gun damaged
2.00×
Shell velocity
1,020m/s
Max range
720m
Caliber
120mm
Ammo capacity
40
… potential damage
16,000hp
Shell cost
915
… full ammo
36,600
Gun depression
15°
Gun elevation
8°
Gun traverse range
360°

Mobility

Top speed
45km/h
Reverse speed
14km/h
Engine power
1,000hp
Power/weight
16.7hp/t
Hull traverse
40.0°/s
Turret traverse
35.0°/s
Terrain resistance
… hard
1.00
… medium
1.20
… soft
2.00
Effective speed
… hard
45.0km/h
… medium
45.0km/h
… soft
30.5km/h
Effective traverse
… hard
40.0°/s
… medium
33.3°/s
… soft
20.0°/s

Survivability

Hit points
1,750hp
Hull armor
… front
110mm
… side
60mm
… rear
40mm
Turret armor
… front
220mm
… side
110mm
… rear
50mm
Track armor
20mm
Fire chance
20.0%
Track repair time
11.70s
Module HP (max / repaired)
… ammo rack
230 / 173hp
… track
240 / 180hp
… engine
310 / 155hp
… fuel tank
200 / 70hp
… turret ring
170 / 85hp
… viewport
110 / 55hp

Spotting & other

View range
390m
Signal range
670m
Camouflage
… stationary
11.2%
… moving
8.4%
Weight
60.0t

Ammunition

Equipment

Consumables

Directives

Field Modifications

Crew Skills

Crew level100%
Commander / Radio Operator
Gunner
Driver
Loader

Vercingétorix modules

IX120 mm DEFA 120 FStock
IXVercingétorixStock
IXTurmo III-VStock
IXVercingétorixStock
IXSCR 619VStock
IXVercingétorix

Vercingétorix historical reference

A project developed in the mid-1950s as an alternative to the AMX 50 program. The hull was designed to be as low as possible, and many of the technical solutions already contained elements of the future AMX 30. However, provisional estimates showed that ensuring reliable armor and installing modern weaponry would take the tank up to 60 tons, which significantly exceed the requirements of the military clients. The tank was never built.