players online
Support us
Hotchkiss EBR
XP cost61,800(~€9.84)
Credits cost1,380,000(~€13.34)
Total cost~€23.18
Free XP from T1124,135(~€18.75)
VIIFranceLight tankWheeled

Hotchkiss EBR

World of Tanks EU statistics for the VII FRANCE light tank Hotchkiss EBR.

Hotchkiss EBR tech tree branch

Hotchkiss EBR characteristics

Firepower

Damage
170hp
… vs modules
100hp
Penetration
144mm
… at 500m
115mm
DPM
1,545
Reload
6.60s
Rate of fire
9.09/min
Aim time
1.80s
Dispersion
0.400m
… moving
0.100
… hull traverse
0.100
… turret traverse
0.120
… after firing
3.50×
… gun damaged
2.00×
Shell velocity
920m/s
Max range
720m
Caliber
75mm
Ammo capacity
60
… potential damage
10,200hp
Shell cost
70
… full ammo
4,200
Gun depression
20°
Gun elevation
10°
Gun traverse range
360°

Mobility

Top speed
70km/h
Reverse speed
45km/h
Engine power
440hp
Power/weight
29.9hp/t
Hull traverse
34.0°/s
Turret traverse
55.0°/s
Terrain resistance
… hard
1.00
… medium
1.35
… soft
1.95
Effective speed
… hard
70.0km/h
… medium
70.0km/h
… soft
56.1km/h
Effective traverse
… hard
34.0°/s
… medium
25.2°/s
… soft
17.4°/s

Survivability

Hit points
800hp
Hull armor
… front
40mm
… side
20mm
… rear
20mm
Turret armor
… front
40mm
… side
20mm
… rear
20mm
Track armor
Fire chance
20.0%
Track repair time
25.06s
Module HP (max / repaired)
… ammo rack
200 / 135hp
… track
130 / 130hp
… engine
250 / 100hp
… fuel tank
150 / 50hp
… turret ring
130 / 65hp
… viewport
90 / 45hp

Spotting & other

View range
310m
Signal range
745m
Camouflage
… stationary
17.8%
… moving
17.8%
Weight
14.7t

Ammunition

Equipment

Consumables

Directives

Field Modifications

Crew Skills

Crew level100%
Commander / Loader
Driver
Gunner
Radio Operator

Hotchkiss EBR modules

VI75 mm SA49 (EBR)Stock
VIICanon de 75 mm Vo 1000 m/s (EBR)
12.2K78K
VIIHotchkiss EBRStock
VIHotchkiss V6 mle. 48Stock
VIIHotchkiss V6 mle. 50
17K42K
VIHotchkiss EBRStock
VIIHotchkiss EBR bis
9.3K21.8K
XSCR-528 FStock
VIIEBR Hotch.

Hotchkiss EBR historical reference

The development of this armored vehicle was part of the corresponding program approved by the military leaders in 1945. In 1949, the Hotchkiss company presented a three-axis prototype. After the trials, the project was discontinued. The prototype did not survive to the present day.