
Cost5,300(~€19.90)
VII
Heavy tankBreakthroughPremium
KV-122
World of Tanks EU statistics for the VII USSR heavy tank KV-122.
KV-122 characteristics
Firepower
- Damage
- 390hp
- … vs modules
- 165hp
- Penetration
- 175mm
- … at 500m
- 152mm
- DPM
- 1,759
- Reload
- 13.30s
- Rate of fire
- 4.51/min
- Aim time
- 3.20s
- Dispersion
- 0.460m
- … moving
- 0.210
- … hull traverse
- 0.210
- … turret traverse
- 0.150
- … after firing
- 4.00×
- … gun damaged
- 2.00×
- Shell velocity
- 780m/s
- Max range
- 720m
- Caliber
- 122mm
- Ammo capacity
- 28
- … potential damage
- 10,920hp
- Shell cost
- 1,025
- … full ammo
- 28,700
- Gun depression
- 20°
- Gun elevation
- 6°
- Gun traverse range
- 360°
Mobility
- Top speed
- 42km/h
- Reverse speed
- 14km/h
- Engine power
- 700hp
- Power/weight
- 15.0hp/t
- Hull traverse
- 40.0°/s
- Turret traverse
- 32.0°/s
- … hard
- 1.00
- … medium
- 1.10
- … soft
- 2.10
- … hard
- 42.0km/h
- … medium
- 42.0km/h
- … soft
- 26.2km/h
- … hard
- 40.0°/s
- … medium
- 36.4°/s
- … soft
- 19.0°/s
Terrain resistance
Effective speed
Effective traverse
Survivability
- Hit points
- 1,200hp
- … front
- 75mm
- … side
- 60mm
- … rear
- 60mm
- … front
- 100mm
- … side
- 90mm
- … rear
- 90mm
- Track armor
- 20mm
- Fire chance
- 15.0%
- Track repair time
- 12.03s
- … ammo rack
- 160 / 100hp
- … track
- 140 / 105hp
- … engine
- 260 / 130hp
- … fuel tank
- 175 / 70hp
- … turret ring
- 130 / 65hp
- … viewport
- 80 / 40hp
Hull armor
Turret armor
Module HP (max / repaired)
Spotting & other
- View range
- 360m
- Signal range
- 730m
- … stationary
- 6.9%
- … moving
- 3.5%
- Weight
- 46.5t
Camouflage
Ammunition
Equipment
Consumables
Directives
Field Modifications
Crew Skills
Crew level100%
KV-122 modules
KV-122 historical reference
Prototype of the KV-122 was created in the spring of 1944 by the Construction Bureau of the Chelyabinsk Kirov Plant on the basis of the KV-85 and differed from the latter in a turret with a 122-mm gun. The turret was copied from the IS-2 designed in 1944. After the production of the IS heavy tanks started, all work on the project was discontinued.





